HOA pool approval, before you call a builder
Most Temecula area HOAs require their own approval on top of the city or county permit. Rules vary by HOA. This is a generic checklist, plus what Redhawk Community Association’s own guidelines document says, checked against that document on October 3, 2026.
Check your own HOA first
If your lot sits inside a homeowners association, the HOA's architectural review most likely applies on top of whichever city or county permit covers your address. See the permit guide and the French Valley page for the city and county side. Rules vary by HOA. Get your own HOA's current CC&Rs and architectural or design guidelines before you plan a pool. A management company or board can usually email them.
A typical architectural committee submittal for a pool asks for some version of this:
- A completed architectural request or home improvement application
- A plot plan or site plan showing where the pool, equipment, and any new fencing or walls will sit
- Multiple copies of the plans, since some associations ask for more than one set
- A statement or signature from any neighbor whose view or property line is affected
- A plan to screen or enclose pool and spa equipment if it is loud, against whatever noise limit the HOA publishes
- Written approval in hand before work starts, kept with the permit paperwork
Most HOAs that publish anything on this say to get their approval before work begins. Some want it before you apply for the city or county permit, others are fine running the two at the same time. A city or county permit does not replace an HOA's own approval, and an HOA's approval does not replace the permit. Ask your committee which order it wants.
What Redhawk Community Association's own guidelines say
Redhawk Community Association covers homes in south Temecula. Its Architectural Guidelines document, adopted in 1991 and most recently revised July 18, 2018, says the Architectural Committee must approve all swimming pools and spas, and that an owner must apply to the committee before starting any construction work. The same document says a city permit does not waive that requirement, and committee approval does not waive the need for a city permit.
On pool and spa equipment noise, the same document states two different numbers in two different places, checked October 3, 2026:
| Where it appears | What it says |
|---|---|
| Architectural Standards, Section O, Swimming Pools/Spas | A sound dampening enclosure is required when equipment readings exceed 70 decibels at 3 feet |
| Exhibit A, the Home Improvement Form | A sound barrier is required if the noise level exceeds 60 decibels at 3 feet |
The two numbers differ inside Redhawk's own document. Confirm with the Architectural Committee which number it is enforcing before you price a sound enclosure for pool equipment.
This page describes only Redhawk. Other Temecula area HOAs are not reviewed here. If your community is not Redhawk, use the generic checklist above and your own HOA's guidelines. Either way, a licensed pool builder still needs the city or county permit on top of any HOA approval.
Talk with a licensed pool builder